NVIDIA · GPUs / AI accelerators
NVIDIA H200 NVL
Data-centre PCIe GPU; cooling and system compatibility to check
Accepting enquiries · sourcing on request
2 official PDFsManufacturer images

GET TO KNOW THIS PRODUCT
Product overview
NVIDIA H200 NVL is specified with NVIDIA Hopper; 141 GB HBM3e. The technical details, manufacturer references and documents below support configuration comparison and procurement planning.
At a glance
- GPU architectureNVIDIA Hopper
- GPU memory141 GB HBM3e
- Memory bandwidth4.8 TB/s
Published maxima do not imply every option can be configured together. Provide workload, capacity, connected equipment and installation environment so compatibility, accessories and delivery requirements can be checked against the full model and SKU.
Typical applications
Enterprise LLM inference and HPC; match NVLink and server configuration.
Plan your configuration
Share your model or application, host system and workload so we can check compatibility and configuration.
Technical specifications
Specifications from manufacturer information; confirm regional options against the quoted SKU.
- GPU architecture
- NVIDIA Hopper
- GPU memory
- 141 GB HBM3e
- Memory bandwidth
- 4.8 TB/s
- Interface / form factor
- PCIe Gen 5; dual-slot air-cooled
- Configurable maximum power
- 600 W
- Multi-GPU connectivity
- 2-way or 4-way NVLink bridges; 900 GB/s per GPU
- GPU partitioning
- Up to 7 MIG instances at 16.5 GB each, software/configuration dependent
- Decode engines
- 7 NVDEC and 7 JPEG decoders
- Confidential computing
- Supported; confirm platform and software requirements
Additional information checked:
MANUFACTURER DOCUMENTS
Official PDFs & product information
Documents open on the manufacturer’s site in a new tab, in their original language. Family documents may include options not supplied in every configuration.
Sources & review dates
Specification source reviewed: 2026-10-21 · Product page published: 2026-10-23
Additional PDF links checked: 2026-10-26
Additional official PDF · dam-cdn.nvd.orangelogic.comAdditional official PDF · dam-cdn.nvd.orangelogic.comPLAN YOUR PURCHASE
Confirm the configuration before ordering
Tell us the quantity, intended use, delivery date and location. We will verify the SKU, available configuration, lead time, regional supply and warranty before quoting.
Submitting an enquiry is not an order, reservation or payment.



